4.
Start engine.
5.
Move safety lock lever to "UNLOCKED" position.
6.
Press travel speed change switch of switch
panel on gauge cluster and change the speed
to low speed.
Check that travel speed is set to low speed
by watching display.
7.
Raise attachment and travel slowly with placing
attachments as shown in figure.
8.
Park the machine horizontally on the rear end
of trailer and then stop it.
9.
Set arm and boom to angle 90 to 110
degrees and travel down slowly from trailer to
ramps. In this time, the bucket position should
be close to ground.
5
To prevent the arm and bucket cylinders from any damage, you are advised to follow the following
instructions.
Do not have the arm and/or bucket cylinder fully extended to a "RAMP OVER CENTER" situation. This
allows sudden and abrupt contact of the arm or bucket to a trailer bed, ramp or the ground.
This can result in internal mechanical contact, which can stretch the cylinder rod(s).
10.
Travel down on ramps slowly while operating boom and arm softly until the machine passes through
the ramps completely.
[
5. TRANSPORTATION
]
5-9
Copyright © 2015 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2YF00022ZE01] [0731CsCshWbYs]
Содержание SK235SR-2
Страница 2: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 6: ...Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 170: ...4 MAINTENANCE 4 2 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...
Страница 192: ...4 MAINTENANCE 4 24 Copyright 2015 Kobelco Construction Machinery Co Ltd All rights reserved S2YF00022ZE01 0731CsCshWbYs...