- 72 -
3. Explanation of the operation devices
3-9-2 Manual purge control
(T218341-017-0E)
(1) Manual purging requested
If automatic purging is not finished within 8 hours
(with the engine running), the warning alarm beeps and manual
purging is requested.
The following message is displayed while manual purging is requested.
(2) Start manual purging.
Move the machine to a safe location and move the safety lock lever to the lock position.
Due to the increased exhaust pipe temperatures after starting manual purging, make sure there is
nothing flammable near the exhaust pipe outlet.
(T218341-018-0E)
Perform screen operations according to the following procedure.
The following message is displayed during manual purging.
During manual purging, the engine speed is fixed at a medium speed regardless of the accelerator dial position.
Manual purging takes about 16 minutes to finish.
(Note: Purging time may vary depending on the external air
temperature and other factors.)
・
If the engine water temperature or hydraulic oil temperature is low, the engine will
automatically warm itself up by fixing the engine speed at a high speed.
If the engine warms up automatically, it will take longer to finish purging.
・
Operating a control lever will cancel manual purging and display the "MANUAL PURGE
REQUESTED" message again.
(T218341-019-0E)
When manual purging is finished, the message will disappear, and the engine speed will return to the speed
corresponding to the accelerator dial position.
Содержание REDGZM HD514MR-7
Страница 2: ...218621 背厚 13 mm 中 ...
Страница 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Страница 12: ... 10 MEMO ...
Страница 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Страница 57: ... 41 Part names and terms 2 Part names and terms ...
Страница 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Страница 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Страница 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Страница 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Страница 185: ... 168 2 Inspection and servicing table ...
Страница 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Страница 261: ... 244 244 MEMO ...
Страница 277: ... 259 3 Crusher operation Crusher operation 3 Gouging using the cylinder stroke end 4 Rough and harsh crushing ...
Страница 290: ... 272 MEMO ...
Страница 314: ... 295 295 4 Hydraulic circuit diagram Hydraulic circuit diagram 4 Hydraulic circuit diagram 01EE 0608 0E ...
Страница 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Страница 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Страница 317: ... 298 298 MEMO ...
Страница 319: ... 300 6 Inspection sheet 6 2 Hydraulic excavator monthly voluntary inspection sheet 01E0 0545 0E ...
Страница 325: ...899 92186210 ...