(T218621-004-0E)
Operation
1. For safe operation
……………………………………………………………………………
1
1-1 Preoperational precautions
……………………………………………………………………………………
1
1-2 Precautions during operation
…………………………………………………………………………………
12
1-3 Precautions after operation
……………………………………………………………………………………
21
1-4 Safety signs
…………………………………………………………………………………………………
23
1-5 Precautions on getting on and off the machine
………………………………………………………………
33
1-6 Precautions when filling with fuel
……………………………………………………………………………
34
1-7 Precautions when replenishing the DEF
………………………………………………………………………
36
2. Part names and terms
…………………………………………………………………………
39
2-1 Terms
…………………………………………………………………………………………………………
39
2-2 Part names
……………………………………………………………………………………………………
39
3. Explanation of the operation devices
………………………………………………………
43
3-1 Inside the cab
…………………………………………………………………………………………………
43
3-2 Control levers
…………………………………………………………………………………………………
55
3-3 Control panel
…………………………………………………………………………………………………
60
3-4 Switch panel
…………………………………………………………………………………………………
62
3-5 Backup switch panel
…………………………………………………………………………………………
63
3-6 Radio
…………………………………………………………………………………………………………
65
3-7 Handling the SCR system
……………………………………………………………………………………
67
3-8 Escape mode
…………………………………………………………………………………………………
69
3-9 Purge
(Rinse) of the SCR system
……………………………………………………………………………
70
3-10 Outside the cab
………………………………………………………………………………………………
74
4. Precautions on handling a new machine
……………………………………………………
81
5. Preoperational checks
…………………………………………………………………………
82
6. Operation
………………………………………………………………………………………
83
6-1 Starting the engine
……………………………………………………………………………………………
83
6-2 Warm-up running
……………………………………………………………………………………………
85
6-3 Traveling operation
…………………………………………………………………………………………
87
6-4 Swing operation
………………………………………………………………………………………………
93
6-5 Working procedure
……………………………………………………………………………………………
95
6-6 Dozer operation (optional)
……………………………………………………………………………………
98
6-7 Stopping the engine
………………………………………………………………………………………
100
6-8 Phenomena peculiar to the hydraulic excavator
……………………………………………………………
101
Содержание REDGZM HD514MR-7
Страница 2: ...218621 背厚 13 mm 中 ...
Страница 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Страница 12: ... 10 MEMO ...
Страница 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Страница 57: ... 41 Part names and terms 2 Part names and terms ...
Страница 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Страница 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Страница 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Страница 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Страница 185: ... 168 2 Inspection and servicing table ...
Страница 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Страница 261: ... 244 244 MEMO ...
Страница 277: ... 259 3 Crusher operation Crusher operation 3 Gouging using the cylinder stroke end 4 Rough and harsh crushing ...
Страница 290: ... 272 MEMO ...
Страница 314: ... 295 295 4 Hydraulic circuit diagram Hydraulic circuit diagram 4 Hydraulic circuit diagram 01EE 0608 0E ...
Страница 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Страница 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Страница 317: ... 298 298 MEMO ...
Страница 319: ... 300 6 Inspection sheet 6 2 Hydraulic excavator monthly voluntary inspection sheet 01E0 0545 0E ...
Страница 325: ...899 92186210 ...