- 234 -
4. Inspection and servicing of each part
4-6-2 How to start the engine using the booster cables
(T218601-044-0E)
Precautions to observe when using the booster cables to start the engine
・
When you are going to start the engine, refer to the section "Battery handling" in order to
handle the battery correctly.
・
Always wear protective goggles when you start the engine.
・
Confirm the procedure for attaching the booster cables.
Incorrect booster cable attachment can cause accidents and breakdowns such as battery
explosion or shorting in the electrical system.
・
When you connect the booster cables, never connect the positive and negative terminals to
each other.
・
This machine uses 24V battery capacity. The assisting machine should have the same
specifications of the battery
(voltage, capacity) as the broken-down machine has. Also use the
right booster cables and clips for the battery capacity. If you use high-voltage sources such as
those for welding equipment, or if you use a battery of a different voltage, you will damage
the electrical equipment.
・
When you are trying to start the engine, switch off all lights and accessories on the machine
which has failed to start.
It is dangerous to operate any accessories while the outside power supply is connected.
・
Park the assisting machine so it is not in contact with the broken-down machine. If they do
touch, a short circuit will result, possibly damaging electrical equipment.
・
In order to prevent the electrical components of the failed machine from getting damaged, turn
the battery disconnect switch to the OFF position "
○
" before installing the booster cable.
・
When you detach the booster cables, do not allow the clips to touch each other or the machine.
(T218081-085-1E)
Содержание REDGZM HD514MR-7
Страница 2: ...218621 背厚 13 mm 中 ...
Страница 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Страница 12: ... 10 MEMO ...
Страница 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Страница 57: ... 41 Part names and terms 2 Part names and terms ...
Страница 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Страница 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Страница 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Страница 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Страница 185: ... 168 2 Inspection and servicing table ...
Страница 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Страница 261: ... 244 244 MEMO ...
Страница 277: ... 259 3 Crusher operation Crusher operation 3 Gouging using the cylinder stroke end 4 Rough and harsh crushing ...
Страница 290: ... 272 MEMO ...
Страница 314: ... 295 295 4 Hydraulic circuit diagram Hydraulic circuit diagram 4 Hydraulic circuit diagram 01EE 0608 0E ...
Страница 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Страница 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Страница 317: ... 298 298 MEMO ...
Страница 319: ... 300 6 Inspection sheet 6 2 Hydraulic excavator monthly voluntary inspection sheet 01E0 0545 0E ...
Страница 325: ...899 92186210 ...