- 138 -
9. Bucket replacement and reversal procedure
9. Bucket replacement and reversal procedure
(01E0-0233-0E)
9-1 Bucket replacement procedure
(01E0-0234-0E)
・
When you hit a pin with a hammer, metal splinters can fly off which could cause severe eye
injuries. Before you start work, always put on protective goggles, helmet, gloves etc.
・
Store the detached bucket so that it cannot fall over and place barriers so that no unauthorised
personnel can approach it.
・
Carry out the replacement/reversal process in a workplace with secure footing.
・
When carrying out team operations such as pin insertion and cylinder extension/retraction,
take care to work safely with good exchange of signals and communication between all those
concerned.
(01E0-0235-1E)
9-1-1 Removal
(01E0-0236-1E)
(1)
Rest the bucket to be replaced on firm, level ground.
(Fig.
①
)
NOTE
When you are extracting the pins, make sure that the bucket is only resting lightly on the ground. If it is pressed
strongly against the ground, the resistance on the pins will be increased making them harder to extract.
(2) Roll the pin seal O-rings onto the bosses of the bucket. (Fig.
②
)
(3) Remove the retaining nuts and bolts and extract bucket pins [A] and [B]. (Fig.
③
)
(4) Raise the boom slightly and separate the bucket from the arm. (Fig.
④
)
(5) Remove the pin seal O-rings.
Содержание REDGZM HD514MR-7
Страница 2: ...218621 背厚 13 mm 中 ...
Страница 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Страница 12: ... 10 MEMO ...
Страница 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Страница 57: ... 41 Part names and terms 2 Part names and terms ...
Страница 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Страница 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Страница 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Страница 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Страница 185: ... 168 2 Inspection and servicing table ...
Страница 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Страница 261: ... 244 244 MEMO ...
Страница 277: ... 259 3 Crusher operation Crusher operation 3 Gouging using the cylinder stroke end 4 Rough and harsh crushing ...
Страница 290: ... 272 MEMO ...
Страница 314: ... 295 295 4 Hydraulic circuit diagram Hydraulic circuit diagram 4 Hydraulic circuit diagram 01EE 0608 0E ...
Страница 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Страница 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Страница 317: ... 298 298 MEMO ...
Страница 319: ... 300 6 Inspection sheet 6 2 Hydraulic excavator monthly voluntary inspection sheet 01E0 0545 0E ...
Страница 325: ...899 92186210 ...