- 227 -
Inspection and servicing of each part
4. Inspection and servicing of each part
(2) Adjustment procedure
1) To increase track shoe tension
Use a high-pressure grease pump to inject grease into the
adjuster cylinder through the grease nipple in the adjustment
window on the outside front of the lower structure.
2) To reduce track shoe tension
Unscrew the grease drain plug of the adjustment window by
turning it to the left. Grease will escape under its own pressure,
increasing slack on the track shoe. After adjustment, screw the
drain plug in.
(Tightening torque: 196N
・
m (20kgf
・
m))
・
If you loosen the plug too much, it could fly under the high pressure of the grease inside. Do
not unscrew the plug by more than one turn.
・
Do not face towards the plug as you fit it.
・
If the track shoe did not loosen, order a repair from your authorised KATO dealer.
(01E0-0348-0E)
(3) To check whether the track shoe tension is correct, travel the machine forward and backward and then re-inspect
the track link tension.
When dimension A falls below the limit of use, the length of adjuster cylinder rod remaining
inside the cylinder becomes too short, risking damage to the seal of the adjuster cylinder.
(01E0-0349-1E)
Содержание REDGZM HD514MR-7
Страница 2: ...218621 背厚 13 mm 中 ...
Страница 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Страница 12: ... 10 MEMO ...
Страница 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Страница 57: ... 41 Part names and terms 2 Part names and terms ...
Страница 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Страница 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Страница 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Страница 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Страница 185: ... 168 2 Inspection and servicing table ...
Страница 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Страница 261: ... 244 244 MEMO ...
Страница 277: ... 259 3 Crusher operation Crusher operation 3 Gouging using the cylinder stroke end 4 Rough and harsh crushing ...
Страница 290: ... 272 MEMO ...
Страница 314: ... 295 295 4 Hydraulic circuit diagram Hydraulic circuit diagram 4 Hydraulic circuit diagram 01EE 0608 0E ...
Страница 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Страница 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Страница 317: ... 298 298 MEMO ...
Страница 319: ... 300 6 Inspection sheet 6 2 Hydraulic excavator monthly voluntary inspection sheet 01E0 0545 0E ...
Страница 325: ...899 92186210 ...