- 43 -
3. Explanation of the operation devices
Explanation of the operation devices
3. Explanation of the operation devices
(01E0-0086-0E)
3-1 Inside the cab
(T218601-010-0E)
If you are going to handle any device other than
for travel and operation, always move the safety
lock lever to the lock position.
If you touch a control lever when the safety lock
lever is not locked, the machine could move
unexpectedly and cause a major accident.
Refer to the "Control levers" section for an
explanation of the safety lock lever.
(01E0-0088-0E)
(1) Door
To open the cab door from the outside, pull the door lever to release the lock.
To open the cab door from the inside, grip the lever on the door inner handle to release the lock.
To hold the door open, fix the door to the door lock securely.
To close the door, release the lock using the "door lock release lever", then close the door. Make sure it is securely
closed.
Use a "key" to lock or unlock the door.
The pressure in the cab is raised to prevent the dust entering the cab, so close the door a little
strongly and check that the door is not ajar.
(T218081-131-0E)
Содержание REDGZM HD514MR-7
Страница 2: ...218621 背厚 13 mm 中 ...
Страница 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Страница 12: ... 10 MEMO ...
Страница 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Страница 57: ... 41 Part names and terms 2 Part names and terms ...
Страница 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Страница 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Страница 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Страница 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Страница 185: ... 168 2 Inspection and servicing table ...
Страница 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Страница 261: ... 244 244 MEMO ...
Страница 277: ... 259 3 Crusher operation Crusher operation 3 Gouging using the cylinder stroke end 4 Rough and harsh crushing ...
Страница 290: ... 272 MEMO ...
Страница 314: ... 295 295 4 Hydraulic circuit diagram Hydraulic circuit diagram 4 Hydraulic circuit diagram 01EE 0608 0E ...
Страница 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Страница 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Страница 317: ... 298 298 MEMO ...
Страница 319: ... 300 6 Inspection sheet 6 2 Hydraulic excavator monthly voluntary inspection sheet 01E0 0545 0E ...
Страница 325: ...899 92186210 ...