- 88 -
4. Precautions on handling a new machine
(2) Pivot turn
This method changes direction by moving only one track shoe.
Use either of the left and right traveling control levers (or pedals).
(3) Spin turn
This method changes direction on the spot by moving both track
shoes simultaneously but in opposite directions.
Operate one traveling control lever (or pedal) for forward motion
and the other for reverse at the same time.
Come to a stop momentarily before beginning a spin turn.
(01E0-0179-0E)
6-3-2 Precautions on traveling
(01E0-0180-0E)
(1) When traveling, always try to steer in the largest possible curves. Avoid rapid spin and pivot turns and similar
maneuvers because they have adverse effects on the rollers, track links and the frame etc. In narrow places or
rocky ground make many tacks to complete maneuvers.
(2) When traveling over long distances, do not travel at the machine's
own power as possible as you can.
If you travel (under the machine's own power) continuously for
long periods, the oil temperature in the reduction gears becomes
abnormally high, which can cause damage to the motors.
Содержание REDGZM HD514MR-7
Страница 2: ...218621 背厚 13 mm 中 ...
Страница 9: ... 7 8 Specifications 8 2 General data 01E0 0023 0E ...
Страница 12: ... 10 MEMO ...
Страница 56: ... 40 2 Part names and terms 2 2 2 Inside the cab 01E0 0050 1E ...
Страница 57: ... 41 Part names and terms 2 Part names and terms ...
Страница 58: ... 42 2 Part names and terms 2 2 3 Outside the cab 01E0 0051 1E ...
Страница 148: ... 132 8 Lifting a load 2 HD514MR LC 7 ...
Страница 183: ... 166 2 Inspection and servicing table 1 Part names for inspection and servicing ...
Страница 184: ... 167 Inspection and servicing table 2 Inspection and servicing table ...
Страница 185: ... 168 2 Inspection and servicing table ...
Страница 200: ... 183 3 Lubrication Lubrication 3 5 Oiling chart 01E0 0293 0E ...
Страница 261: ... 244 244 MEMO ...
Страница 277: ... 259 3 Crusher operation Crusher operation 3 Gouging using the cylinder stroke end 4 Rough and harsh crushing ...
Страница 290: ... 272 MEMO ...
Страница 314: ... 295 295 4 Hydraulic circuit diagram Hydraulic circuit diagram 4 Hydraulic circuit diagram 01EE 0608 0E ...
Страница 315: ... 296 296 5 Electrical circuit diagram 5 Electrical circuit diagram 01EE 0609 0E ...
Страница 316: ... 297 297 5 Electrical circuit diagram Electrical circuit diagram ...
Страница 317: ... 298 298 MEMO ...
Страница 319: ... 300 6 Inspection sheet 6 2 Hydraulic excavator monthly voluntary inspection sheet 01E0 0545 0E ...
Страница 325: ...899 92186210 ...