
2 - 40
When the plunger is in operation(5Pi pilot signal : OFF)
If Pv is higher than Pc(In the case of boom raise)
When the plunger moves to right, the high pressure oil enters to chamber(3).
Therefore, the pressure of chamber(1) becomes Pc as it is connected to chamber(2) via
orifice(4) ; Poppet(B) is opened by pressure(Pv) of chamber(3) ; Oil from high pressure feed
passage flows into the cylinder head side.
ڹ
Ϧ
1
3(Pv)
2(Pc)
4
5Pi
Pilot signal port
dr4
Bb1
To boom
cylinder head
Tank passage
High pressure
feed passage
Spool(A)
Poppet(B)
d1
d2
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...