8 - 142
Assembly
Install packings(5,7) to cylinder liner(2).
When installing packing(5,7) take full care
so as not to damage the lip.
Pour grease into cylinder liner(2), then
push in piston(6) by hand.
After take grease out of plug mounting
hole, let air out.
If air letting is not sufficient, it may be
difficult to adjust the tension of crawler.
Fit plug(8) to piston(6).
Tightening torque : 10
Ź
1kgf
ş
m
(72.3
Ź
7.2lbf
ş
ft)
Install spring(1) and fork(3) to cylinder
liner(2).
Apply pressure to spring(1) with a press
and tighten lock nut(4).
Apply sealant before assembling.
During the operation, pay attention
specially to prevent the press from
slipping out.
Lighten the press load and confirm the
set length of spring(1).
(3)
ڸ
Ɠ
ڹ
Ɠ
ں
ڻ
ڼ
Ɠ
Ɠ
ڽ
2
6
8
3
4
1
7
2
5
Press
437
Ź
1.5
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...