8 - 3
3. COMPLETING WORK
If the coolant has been drained, tighten the drain valve, and add water to the specified level. Run
the engine to circulate the water through the system. Then check the water level again.
If the hydraulic equipment has been removed and installed again, add engine oil to the specified
level. Run the engine to circulate the oil through the system. Then check the oil level again.
If the piping or hydraulic equipment, such as hydraulic cylinders, pumps, or motors, have been
removed for repair, always bleed the air from the system after reassembling the parts.
Add the specified amount of grease(Molybdenum disulphied grease) to the work equipment related
parts.
1)
2)
3)
4)
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...