2 - 32
Make up operation
Poppet(C) is securely seated because the cylinder port pressure is normally higher than the
tank pressure and d
3
<d
4.
When the cylinder port pressure drops(Closer to negative pressure) until the cylinder port
pressure is lower than the tank pressure, poppet(C) opens receiving the tank pressure for
the difference in area between d
3
and d
4
; oil flows from the low pressure passage(Tank
passage) to the cylinder port in order to prevent cavitation.
ڹ
A.
B.
Pilot poppet(E)
Spring(D)
Main poppet(B)
Poppet(C)
Piston(A)
d
3
d
1
5
4
Low pressure passage
d
2
d
4
6
Cylinder port
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...