7 - 12
Bucket cylinders.
Measure the time it takes to roll in the
bucket, and the time it takes to roll out
the bucket. To do so, position the
bucket at one stroke end, then move the
control lever to the other stroke end as
quickly as possible.
Repeat each measurement 3 times and
calculate the average values.
Evaluation
-
-
The average measured time should meet the following specifications.
Unit : Seconds
(4)
Model
R160LC-3
Function
Boom raise
Boom lower
Arm in
Arm out
Bucket load
Bucket dump
Standard
3.2
Ź
0.3
2.7
Ź
0.3
3.5
Ź
0.4
2.7
Ź
0.3
2.2
Ź
0.4
2.1
Ź
0.3
Maximum allowable
3.8
3.0
4.6
3.8
3.9
2.6
Remarks
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...