3. CHARGING CIRCUIT
When the starter is activated and the engine is started, the operator releases the key switch to the ON
position.
Charging current generated by operating alternator flows into the battery through the Battery
relay(CR-1).
The current also flows from alternator to each electrical component and controller through the fuse
box.
OPERATING FLOW
Warning flow
Alternator "I" terminal
I/conn
ŭ
CN-3(K)
Ů
CPU Alternator power level
ŭ
CN-50(5)
Ů
Cluster charging warning lamp
Charging flow
Alternator B
+
terminal
Battery relay(M8) B) terminal
CHECK POINT
4 - 9
2)
(1)
(2)
Engine
Start switch
Check point
Voltage
RUN
ON
ڸ
- GND(Battery voltage)
ڹ
- GND(Battery relay)
ں
- GND(Alternator B terminal)
ڻ
- GND(Alternator I terminal)
ڼ
- GND(CPU)
20~30V
Ɠ
GND : Ground
1)
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...