2 - 41
Ϧ
If Pc is higher than Pv(In the case of boom down operation)
When plunger moves to left, chamber(3) is connected with tank passage. At the same time,
spool(A) moves to right by the pressure of pilot signal ; Chamber(1) and drain port(dr4) are
connected.
Therefore, pressure of chamber(1) becomes low ; Pressure Pc is applied to(Area d
1
- area d
2
),
pushing open poppet(B), and return oil from the cylinder head side flows into the tank
passage.
1
3(Pv)
2(Pc)
4
5Pi
Pilot signal port
dr4
Bb1
From boom
cylinder head
Tank passage
High pressure
feed passage
Spool(A)
Poppet(B)
d1
d2
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...