6 - 42
TEST PROCEDURE
Test 1 : Check resistance at connector
CN-52(1)-(7).
Starting key OFF.
Disconnect connector CN-52.
Check resistance between pin and at
connector CN-52(1)-(7).
7
6
5
4
1
2
3
8
9 10
Multimeter
CPU
CONTROLLER
CN-50
CN-51
CN-52
CN-53
CN-52
CN-75
Multimeter
CN-75
Multimeter
EPPR VALVE
(1)
ڸ
ڹ
ں
2)
Test 2 : Check resistance at connector
CN-75.
Starting key OFF.
Disconnect connector CN-75 from
EPPR valve at main hydraulic pump.
Check resistance between 2 lines as
figure.
(2)
ڸ
ڹ
ں
Test 3 : Check electric current at EPPR
valve.
Install multimeter as figure.
Start engine.
Set S-mode and cancel auto decel
mode.
If tachometer show approx 2250
Ź
50rpm,
check electric current.
(3)
ڸ
ڹ
ں
ڻ
SPEC : 17.5
Ź
1
װ
(20
Ş
C)
SPEC : 17.5
Ź
1
װ
(20
Ş
C)
SPEC : 200~400mA(S mode)
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...