8 - 12
DISASSEMBLY
Select place suitable to disassembling.
Select clean place.
Spread rubber sheet, cloth or so on on
overhaul workbench top to prevent parts
from being damaged.
Remove dust, rust, etc. from pump
surfaces with cleaning oil or so on.
Remove drain port plug(467) and let oil
out of pump casing.(Front and rear pump)
3)
Place pump horizontally on workbench
with its regulator-fitting surface down and
separate pump casing(271) from valve
block(312).
Before bringing this surface down, spread
rubber sheet on workbench without fail to
prevent this surface from being damaged.
(1)
Ɠ
Ɠ
(2)
(3)
(6)
Ɠ
Loosen hexagon socket head bolts(401)
which tighten swash plate support(251),
pump casing(271) and valve block(312).
(5)
Remove hexagon socket head bolts(412,
413) and remove regulator.
Remove hexagon socket head bolts(416)
and remove gear pump.
(4)
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...