8 - 110
1. REMOVAL AND INSTALL
REMOVAL
Lower the work equipment to the ground
and stop the engine.
Operate the control levers and pedals
several times to release the remaining
pressure in the hydraulic piping.
Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can
penetrate the skin causing serious injury.
When pipes and hoses are disconnected,
the oil inside the piping will flow out, so
catch it in oil pan.
Disconnect all hoses.
Sling the turning joint assembly (1) and
remove the mounting bolt(2).
ş
Weight : 36kg(79lb)
ş
Tightening torque : 12.2
Ź
1.3kgf
ş
m
(88.2
Ź
9.4lbf
ş
ft)
Remove the turning joint assembly.
When removing the turning joint, check
that all the hoses have been disconnected.
INSTALL
Carry out installation in the reverse order
to removal.
Take care of turning joint direction.
Assemble hoses to their original positions.
Confirm the hydraulic oil level and check
the hydraulic oil leak or not.
GROUP 8 TURNING JOINT
1
2
1)
2)
(1)
(2)
(3)
Ɠ
(4)
(5)
(6)
Ɠ
(1)
Ɠ
Ɠ
Ɠ
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...