2-51
Operating principle
When the swing control lever(1) is set to the swing position, the pilot oil go to the swing control
valve(2) and to Sh of the time delay valve(3) via the shuttle valve(4), this pressure shift time
delay vlave so, pilot pump charged oil(P
3
) go to the chamber G.
This pressure is applied to move the piston(702) to the upward against the force of the
spring(712) thus releasing the brake force.
5
P3
2
2
4
1
Sh
3
G
702
712
1
Swing control lever
2
Swing control valve(MCV)
3
Time delay valve
4
Shuttle valve
5
Pilot pump
702
Brake piston
712
Brake spring
ڹ
a.
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...