6 - 48
TEST PROCEDURE
Test 9 : Check electric current at EPPR
valve at F-mode
Install multimeter as figure.
Start engine.
Set F-mode with 1750
Ź
50rpm.
Check electric current.
CN-75
Multimeter
EPPR VALVE
CN-75
Supply line, pilot press
Pressure adjusting
screw locknut
(1)
ڸ
ڹ
ں
ڻ
2)
Test 10 : Check pressure at EPPR valve
at F-mode
Connect pressure gauge at EPPR valve.
Start engine.
Set F-mode with 1750
Ź
50rpm.
Operate bucket lever completely push or
pull.
Hold arm lever at the end of stroke.
Check pressure at relief position.
(2)
ڸ
ڹ
ں
ڻ
ڼ
ڽ
SPEC : 400~500mA
SPEC : 15~25kgf/cm
2
(218~363psi)
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...