1. POWER CIRCUIT
The negative terminal of battery is grounded to the machine chassis through master switch.
When the start switch is in the OFF position, the current flows from the positive battery terminal as
shown below.
OPERATING FLOW
Battery Battery relay Fusible link
ŭ
CN-60(1)
Ů
Fuse box(No.11) I/conn
ŭ
CN-1(N)
Ů
Start switch
ŭ
CS-2(1)
Ů
Fuse box(No.12) I/conn
ŭ
CN-1(B)
Ů
I/conn
ŭ
CN-6(4)
Ů
Room lamp
ŭ
CL-1(2)
Ů
Cassette radio
ŭ
CN-27(7)
Ů
Fuse box(No.13) CPU controller
ŭ
CN-53(3)
Ů
Ɠ
I/conn : Intermediate connector
CHECK POINT
4 - 5
Engine
Start switch
Check point
Voltage
OFF
OFF
ڸ
- GND(Battery 1EA)
ڹ
- GND(Battery 2EA)
ں
- GND(Battery 2EA)
ڻ
- GND(Fusible link)
10~12.5V
20~25V
20~25V
20~25V
Ɠ
GND : Ground
1)
2)
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...