
3 - 10
When the arm half flow switch is turned ON, the arm half flow solenoid valve is switched to ON and
Arm2 pilot port XAa2 is connect with drain line : So the spool of ARM2 is not actuated. As a result,
the arm in operation is only the ARM1 section. This function is useful to fine control of the arm in
case of finishing work.
5. ARM HALF FLOW SYSTEM
BOOM2
TRAVEL MOTOR
ARM CYLINDER
BOOM CYLINDER
SWING MOTOR
HYD
TANK
PILOT PUMP
BOOM1
BUCKRT CYLINDER
TRAVEL
SWING
ARM
BUCKET
BOOM
RCV PEDAL
RCV LEVER(LH)
RCV LEVER(RH)
RELIEF VALVE
SPIN
FILTER
LINE
FILTER
SAFETY
SOLENOID VALVE
ARM1
SWING
TRAVEL(RH)
ARM2
BUCKET
OPTION
TRAVEL(RH)
STRAINER
XAa2
XAa1
XAah
XAa1
XAah
ARM HALF
SOLENOID
VALVE
XAa2
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...