
2-23
(2) Swing priority circuit
P1
P2
Pp
Fr
Fl
AM-2
AM-1
SW
P2
P1
TR
OPT
BKT
BM1
AM2
R
TL
SW
BM2
AM1
TS
P1
P2
As
Bs
XBs
SW
AM2
XAa2
XAa1
AM1
XAas
Ba1
Aa1
Swing priority circuit
Oil from pump P1 is fed into cylinder port
Bs via center bypass passage by adding
pressure to swing plunger pilot port XBs.
In case of simultaneous operation of
swing and arm, the delivery oil from P1 for
swing is also supplied to arm cylinder port
Aa1.
Meanwhile the pilot oil form the swing
shuttle valve flows into stroke limiter port
XAaS of arm spool, then the arm1
plunger does not full stroke.
Consequently, the swing priority is
maintained.
(2)
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...