6 - 50
5. SLOW ACTION OF ENGINE SPEED CHANGE WHEN CHANGE THE MODE
Before carrying out below procedure, check all the related connectors are properly inserted.
INSPECTION PROCEDURE
Ɠ
1)
YES
YES
NO
SPEC : (6)-(22) : 5
Ź
1V
(14)-(22) : 0.1~0.9k
װ
See TEST 12
Check interference
between
connecting rod and
governor motor
Check voltage
between CN-50
(6)-(22) and check
resistance between
CN-50(14)-(22)
SPEC : 1~2
װ
See TEST 11
Check resistance
between CN-53
(1)-(13)
Cause
Remedy
Slow action of
engine speed
control due to
interference
Defective CPU
controller
Defective governor
motor
Defective governor
motor
Check and repair
Replace
Replace
Replace
NO
YES
NO
W
X
CN-3
CN-76
CPU CONTROLLER
CN-53
1
1
2
CD-17
TACHO SENSOR
DC MOTOR
1
2
3
4
5
6
M
P+
SIG
P-
NC
M+
M-
2
1
3
5
6
CN-50
6
14
16
22
23
13
rpm
Wiring diagram
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...