
2 - 36
Arm holding valve operation
When the plunger is in neutral(4Pi pilot signal : OFF)
Piston(A) is in the status as shown ; Pressure signal(Pg2) and chamber(Y) are shut off.
Thus piston(B) and poppet(C) are in the status as shown;Passages(5) and (6) are shut off by
poppet(C).
Therefore, the pressure of chamber(1) becomes pressure Pc as it is connected with chamber(2)
via orifice(4). Since d
1
>d
2
, poppet(E) is seated and chambers(2) and (3) are completely
blocked.
(7)
ڸ
Drain
port
d1
d2
High pressure
feed passage
Tank passage
3(Pv)
2(Pc)
1
Z
VIEW Z
7
Arm1 plunger
To arm
cylinder rod
(Ba1)
4
Poppet(E)
5
6
Piston(B)
Poppet(C)
Check(D)
Pg2
4Pi
Pilot signal port
Piston(A)
Y
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...