8 - 146
BOOM ASSEMBLY
Removal
Remove arm and bucket assembly.
For details, see removal of arm and
bucket assembly.
Remove boom cylinder assembly from
boom.
For details, see removal of boom
cylinder assembly.
Disconnect head work wiring.
Disconnect bucket cylinder hose(2) and
arm cylinder hose(1).
When the hoses are disconnected, oil
may spurt out.
Sling boom assembly(3).
Remove bolt(4), nut(5) and pull out the
pin(6) then remove boom assembly.
ş
Weight :1230kg(2710lb)
When lifting the boom assembly always
lift the center of gravity.
Install
Carry out installation in the reverse order
to removal.
When lifting the boom assembly, always
lift the center of gravity.
Bleed the air from the cylinder.
(1)
(2)
ڸ
ڹ
ں
ڻ
Ɠ
ڼ
ڽ
Ɠ
ڸ
Ɠ
3)
2
1
4, 5, 6
3
Crane
6
4
5
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...