5 - 19
1. CPU CONTROLLER MOUNTING
1
CPU controller
2
Electric box
3
Bolt(M8)
GROUP 11 ENGINE CONTROL SYSTEM
2. CPU CONTROLLER ASSEMBLY
Remove 4 CPU controller mounting bolt(3).
Disconnect 4 connectors from CPU
controller.
Remove 6 pieces of screw and open the
cover of CPU controller.
Inspection : Check PCB(Printed Circuit
Board)
If any damage is found, replace CPU
controller assembly.
If not, but CAPO system does not work
then replace A only.(A : EPROM)
Removal : Insert small screwdriver or
knife to bottom of EPROM and lift up
carefully.
Assembly : Assemble EPROM to mach
with semicircle mark.
1)
2)
3)
4)
(1)
(2)
Ɠ
Ɠ
1
3
2
A
CN-50
CN-51
CN-52
CN-53
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...