2 - 37
When the plunger is in operation(4Pi pilot signal : OFF)
If Pv is higher than Pc(In the case of arm out)
When the plunger moves to left, the high pressure oil enters to chamber(3).
Therefore, the pressure of chamber(1) becomes Pc as it is connected to chamber(2) via
orifice(4) ; Poppet(E) is opened ; Oil from high pressure feed passage flows into the cylinder
rod side.
ڹ
Ϧ
Drain
port
d1
d2
High pressure
feed passage
Tank passage
3(Pv)
2(Pc)
1
Z
VIEW Z
7
To arm
cylinder rod
(Ba1)
4
Poppet(E)
5
6
Piston(B)
Poppet(C)
Check(D)
Pg2
4Pi
Pilot signal port
Piston(A)
Y
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...