2 - 38
Ϧ
If Pc is higher than Pv(In the case of arm in operation)
When the pressure of pilot signal enters, piston(A) moves to down.
When the pressure signal(Pg2) enters to chamber(Y), piston(B) moves to left and poppet(C)
opens ; Passages(5) and (6) are connected.
If pressure Pc of cylinder port chamber(2) is higher than pressure Pv of chamber(3)(In the
case of arm in operation) oil from chamber(1) pushes up check valve(C) via passages(5) and
(6) and enters chamber(3) through passage(7). Chamber(3) is connected with the tank
passage because the arm plunger is moved to right. Therefore, pressure Pc is applied to(Area
d
1
- area d
2
), pushing open poppet(E), and return oil from the cylinder rod side flows into the
tank passage.
Drain
port
VIEW Z
7
6
Piston(B)
Poppet(C)
Check(D)
Pg2
4Pi
Pilot signal port
Piston(A)
Y
d1
d2
High pressure
feed passage
Tank passage
3(Pv)
2(Pc)
1
Z
To arm
cylinder rod
(Ba1)
4
Poppet(E)
5
Содержание R 160 LC-3
Страница 9: ......
Страница 142: ...4 4...
Страница 152: ...4 14 BEACONLAMPCIRCUIT FUSE BOX BEACON LAMP SW BEACON LAMP 2 3 1 4 4 CN 2 CN 14 CL 7 CN 6 CN 1 CN 36 CS 23...
Страница 171: ...4 33 No of pin Receptacle connector Female Plug connector Male 20 1 11 10 20 S817 020105 MULTILOCK TYPE CONNECTOR 2...
Страница 182: ...4 44 No of pin Receptacle connector Female Plug connector Male 24 12 24 1 13 S815 024000...
Страница 394: ...8 81 8 Fit spool 34 spring 35 to base plate 3 and tighten plug 36 Pay attention to spool direction...
Страница 397: ......
Страница 398: ......
Страница 399: ......
Страница 400: ......
Страница 401: ......
Страница 402: ......
Страница 403: ......
Страница 404: ......
Страница 405: ......
Страница 406: ......
Страница 407: ......
Страница 416: ...8 103 Remove lock nut 21 and then boot 26 15...
Страница 427: ...8 114 Install cover 3 to hub 1 and tighten bolts 14 Torque 5 5 12 5kgf m 40 90lbf ft 7 14 15 3...
Страница 456: ...8 143 1 STRUCTURE GROUP 11 WORKEQUIPMENT SECTION A SECTION B SECTION C C B B A A C...