
E-4
Appendix E
40A Service Bypass Unit: Specifications and Procedures
Unpacking the Service Bypass Unit
Unpacking the Service Bypass Unit
Use the following procedure to unpack the Service Bypass Unit:
1. Remove the carton containing the Service Bypass Unit (top box).
2. Open the carton.
3. Remove materials such as manuals from the top of the box and set them aside.
4. Lift both cords, then remove the packaging that supports the cords by letting the cords
pass through the opening in the cardboard. See Figure E-2.
Figure E-2 Unpacking the 40A PowerTrust Service Bypass Unit
5. Remove the L-shaped corrugated cardboard pads from the top of the Service Bypass
Unit.
Содержание PowerTrust A3589A
Страница 7: ...Contents Contents 5 ...
Страница 8: ...Contents 6 Contents ...
Страница 10: ...Contents 8 Figures ...
Страница 12: ...Contents 10 Tables ...
Страница 14: ...2 ...
Страница 20: ...Preface 8 ...
Страница 22: ...Preface 10 ...
Страница 52: ...1 30 Chapter1 Overview Specifications Figure 1 8 UPS Input Voltage Transfer Points ...
Страница 56: ...1 34 Chapter1 Overview UPS Modes Figure 1 10 Simplified UPS 5 5 kVA UPS Block Diagram ...
Страница 62: ...1 40 Chapter1 Overview Support Information ...
Страница 76: ...2 14 Chapter2 Unpacking and Inspecting Shipping and Storage Requirements ...
Страница 104: ...3 28 Chapter3 Installing the UPS Examples of PowerTrust Connections in a System ...
Страница 116: ...5 4 Chapter5 Verification Procedures Load Testing ...
Страница 148: ...7 6 Chapter7 Cleaning and Maintenance Exchanging Batteries Fan ...
Страница 190: ...A 42 AppendixA HP UX UPS Monitor Error Messages Log Only Messages ...
Страница 218: ...C 8 AppendixC Configuring the OS for the PowerTrust UPS Power Failing the UPS ...