
Handling and installation
Cable installation
2005-9015-009
01. August 2018
6.26.3 Step 3: Link the scrapers to the drive unit with the combi-rope
Warning!
Inadvertent start!
Shutdown is required! Shut the main power supply and lock with a
locking device. Post a sign on the panel stating: ”Do not turn on,
electric work in progress” in order to prevent an inadvertent energizing
of the main electric supply.
● Complete the cable path (2) using
the combi-rope, as illustrated in the
layout chosen.
● Place the combi-rope roll next to the
scraper.
● Pass the cable through the corner
wheel and/or the drive unit wheel.
● Run the cable inside the drive unit by
following the path illustrated
hereafter.
● Pass the cable through the second
drive unit wheel and through the
corner wheel.
● Pull the combi-rope to reach the
scraper.
● Pass the cable through the scraper
draw bar.
● Keep ½” (13 mm) of cable out of
the tensioner. Tighten the
tensioner bolt to secure the cable.
● Use the wrench to wind 2 rolls on
the tensioner.
Содержание Fit R-300
Страница 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Страница 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Страница 42: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 42 168 5 9 V shape scraper Floor mounted ...
Страница 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Страница 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...
Страница 128: ...Programming Farm access 2005 9015 009 01 August 2018 128 168 7 21 3 Wiring 1 2 3 5 5 1 1 2 3 5 5 5 ...