Starting for the first time
Initial commissioning checklist
2005-9015-009
01. August 2018
8.3
Initial commissioning checklist
This checklist must be completed by the dealer and the customer. The initial
commissioning steps intend to test the product to validate its functionality.
Therefore, the dealer and the customer must operate the product to make sure
the product is assembled and/or installed according to the manufacturer's
instructions.
General
DONE
N/A
The owner received the instruction manual from the dealer and commits to read it.
Items provided by the owner comply with the specifications indicated in the technical data section of the
instruction manual.
Facility
DONE
N/A
All concrete alleys are smooth, free from imperfections.
Guards protecting the bridging areas are installed.
Inspection
DONE
N/A
A visual inspection was performed. There are no sign of leaks, distortion or defective parts.
All bolts are tightened.
The safety guards and safety labels are installed.
All electric connections are connected and secured.
The lubrication points are lubricated.
Control panel
DONE
N/A
The control panel is connected to a cut-off switch.
All electric components and wires are secured.
The control panel door is closed and locked.
All control panel parameters have been programmed accurately.
The emergency stop button is functional.
The electric motor parameters are entered in the control panel.
The motor capacity HP value was obtained by performing the fine tuning steps included in the control
panel instruction manual.
The motor minimum load value was obtained by performing the fine tuning steps included in the control
panel instruction manual.
The control panel is programmed to operate according to the requirements of the owner.
Содержание Fit R-300
Страница 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Страница 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Страница 42: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 42 168 5 9 V shape scraper Floor mounted ...
Страница 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Страница 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...
Страница 128: ...Programming Farm access 2005 9015 009 01 August 2018 128 168 7 21 3 Wiring 1 2 3 5 5 1 1 2 3 5 5 5 ...