
Maintenance
Check the bolts and anchor bolts torque
2005-9015-009
01. August 2018
11.6
Visual inspection
First 50 hours of use
Warning!
Inadvertent start!
Shutdown is required! Shut the main power supply and lock with a
locking device. Post a sign on the panel stating: ”Do not turn on,
electric work in progress” in order to prevent an inadvertent energizing
of the main electric supply.
Step 1 - Inspect the system to find any defective parts or signs of abnormal wear
Caution!
Risk of injury!
Wear protective boots, eye gear and gloves.
● Check the cables, corner wheels, scrapers, motor and speed reducer.
● Change the cable if it shows signs of significant wear.
Step 2 - Check for manure accumulation
● Remove accumulated manure on the corner wheels, the scraper, etc.
11.7
Check the bolts and anchor bolts torque
First 50 hours of use
Warning!
Inadvertent start!
Shutdown is required! Shut the main power supply and lock with a
locking device. Post a sign on the panel stating: ”Do not turn on,
electric work in progress” in order to prevent an inadvertent energizing
of the main electric supply.
● Check that all bolts and anchor bolts are secured,
● Torque when required,
Содержание Fit R-300
Страница 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Страница 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Страница 42: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 42 168 5 9 V shape scraper Floor mounted ...
Страница 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Страница 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...
Страница 128: ...Programming Farm access 2005 9015 009 01 August 2018 128 168 7 21 3 Wiring 1 2 3 5 5 1 1 2 3 5 5 5 ...