
Starting for the first time
Initial commissioning checklist
2005-9015-009
01. August 2018
Drive unit
DONE
N/A
The drive unit is anchored to the concrete floor.
Air vents are installed on the gearboxes.
The electric motors can be shut down only when activating the control panel external cut-off switch.
The electric motor rotates in the proper direction.
Cable
DONE
N/A
The cable tension is adjusted.
The cable does not touch the floor, objects, etc.
Note!
The dealer and the owner must fill the warranty registration form when
the checklist is completed.
Dealer's signature:
______________________________________________________________
Owner's signature:
______________________________________________________________
Date:
______________________________________________________________
Содержание Fit R-300
Страница 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Страница 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Страница 42: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 42 168 5 9 V shape scraper Floor mounted ...
Страница 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Страница 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...
Страница 128: ...Programming Farm access 2005 9015 009 01 August 2018 128 168 7 21 3 Wiring 1 2 3 5 5 1 1 2 3 5 5 5 ...