
Starting for the first time
Safety instructions for initial commissioning
2005-9015-009
01. August 2018
8
Starting for the first time
8.1
Special personnel qualification required for initial commissioning
Initial commissioning must be performed by trained personnel in accordance
with the safety instructions.
Read the section Safety - Personnel qualifications.
8.2
Safety instructions for initial commissioning
Warning!
Risk of injury and/or death!
A discomforted animal may not be able to avoid or move away from an
operating scraper. Keep all discomforted animals away from the free
stall area.
Warning!
Risk of injury or death of animals!
A high settings of the detection parameters reduces load detection
sensitivity.
Keep these parameters set as low as possible.
Warning!
Risk of fall!
Be aware of the surroundings when working near areas such as a
storage pit, a cross gutter, a transfer pump hopper, etc.
Caution!
Slippery floor!
Manure makes the floor slippery, be aware.
Use the walkways when possible.
Caution!
Risk of stumble!
Be aware of the cable in the free stall alleys.
Attention!
Remove all unnecessary tools, objects, lifting devices, etc, from the
initial commissioning area.
Содержание Fit R-300
Страница 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Страница 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Страница 42: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 42 168 5 9 V shape scraper Floor mounted ...
Страница 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Страница 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...
Страница 128: ...Programming Farm access 2005 9015 009 01 August 2018 128 168 7 21 3 Wiring 1 2 3 5 5 1 1 2 3 5 5 5 ...