
Maintenance
Adjust the tension of the rope / cable
2005-9015-009
01. August 2018
● Position the cable to keep ½” (13
mm) of cable out of the tensioner
and lock with the bolt. Repeat for the
second tensioner.
● Using the wrench, wind the
tensioner until the scraper starts
moving. Repeat for the second
tensioner.
● Check the cable tension on the
corner wheels located next to the
drive unit.
● Position a 36” (1 m) straight edge (A)
on the floor next to the cable.
● Pull the cable by hand to measure
the tension in the center of the
straight edge (A). The cable must
roughly deflect 1” (25 mm).
● If the deflection is greater than 1” (25
mm), follow the steps below to adjust
tension correctly.
● Roll one catch on each scraper
tensioner using the wrench.
Proceed scraper by scraper. Make
sure the cable tensioner is correctly
locked.
● Repeat these steps until the
deflection is obtained on each
corner wheel located next to the
drive unit.
● Install the tensioner cover on the
scraper draw bar.
Содержание Fit R-300
Страница 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Страница 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Страница 42: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 42 168 5 9 V shape scraper Floor mounted ...
Страница 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Страница 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...
Страница 128: ...Programming Farm access 2005 9015 009 01 August 2018 128 168 7 21 3 Wiring 1 2 3 5 5 1 1 2 3 5 5 5 ...