
Handling and installation
Electric connections
2005-9015-009
01. August 2018
6.25
Electric connections
Electric work must be performed by a certified electrician.
6.25.1 Connecting the proximity switches
● Connect the two proximity switches to the control panel. Refer to section
Appendix - Wiring diagram.
6.25.2 Connecting electric motors
Note!
GEA provides specifications and electric motor wiring diagram related
to Baldor motor(s). For any other motor brand, contact the
manufacturer.
Important!
Never connect an external cut-off switch directly to the motor(s). The
external cut-off switch must be connected to the control panel to
shutdown or energize the entire cleaning system through the control
panel only.
This symbol indicates that the terminal must be connected to earth
ground.
● Turn the main power supply on.
● Use the instant start function to engage the drive unit motors. Refer to
section Programming.
● Check the rotation of each motor. Make sure both motor rotates in the same
direction.
● Set the parameter Minimum load (HP) in the control panel. Refer to section
Minimum load (HP) fine tuning.
Содержание Fit R-300
Страница 38: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 38 168 5 8 16 scraper Floor mounted ...
Страница 40: ...Geometric data 16 scraper 2005 9015 009 01 August 2018 40 168 Guided by a groove ...
Страница 42: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 42 168 5 9 V shape scraper Floor mounted ...
Страница 44: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 44 168 Guided by a groove ...
Страница 46: ...Geometric data V shape scraper 2005 9015 009 01 August 2018 46 168 Bidirectional scraper ...
Страница 128: ...Programming Farm access 2005 9015 009 01 August 2018 128 168 7 21 3 Wiring 1 2 3 5 5 1 1 2 3 5 5 5 ...