GE M
EDICAL
S
YSTEMS
- K
RETZTECHNIK
U
LTRASOUND
D
IRECTION
105844, R
EVISION
1
V
OLUSON
® 730 S
ERVICE
M
ANUAL
4-2
Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1
Power On / Boot Up
NOTE:
After turning off a system, wait at least ten seconds before turning it on again. The system may not be
able to boot if power is recycled too quickly.
4-3-1-1
Scanner Power On
1.) Connect the Power Cable to the back of the system.
2.) Connect the Power Cable to an appropriate mains power outlet.
3.) Switch ON the Circuit Breaker at the rear of the system.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
NOTICE
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
on the system.
Figure 4-1 Circuit Breaker and Power Cable on Back of Voluson® 730
NOTICE
When AC power is applied to the scanner, the
ON/OFF
switch on the Control panel illuminates amber,
indicating the System (including the Back-end Processor) is in standby mode.
Signed
Date
TAG
&
LOCKOUT
Circuit Breaker
Mains Power Cable
Содержание Voluson 730
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS KRETZTECHNIK ULTRASOUND DIRECTION 105844 REVISION 1 VOLUSON 730 SERVICE MANUAL iii ...
Страница 8: ...GE MEDICAL SYSTEMS KRETZTECHNIK ULTRASOUND DIRECTION 105844 REVISION 1 VOLUSON 730 SERVICE MANUAL vi ...
Страница 24: ...GE MEDICAL SYSTEMS KRETZTECHNIK ULTRASOUND DIRECTION 105844 REVISION 1 VOLUSON 730 SERVICE MANUAL xxii ...
Страница 268: ...GE MEDICAL SYSTEMS KRETZTECHNIK ULTRASOUND DIRECTION 105844 REVISION 1 VOLUSON 730 SERVICE MANUAL IV ...
Страница 269: ......