GEK-106310AB
F650 Digital Bay Controller
C-5
APPENDIX C
C.2 DNP 3.0 DEVICE PROFILE DOCUMENT
C
b) DNP V3.00 DEVICE PROFILE DOCUMENT (SHEET 2 OF 3)
Requires Application Layer Confirmation:
Never
Always
When reporting Event Data
When sending multi-fragment responses
Sometimes
Configurable
Timeouts while waiting for:
Data Link Confirm:
Complete Appl. Fragment:
Application Confirm:
Complete Appl. Response
None
None
None
No0ne
Fixed at 3 s
Fixed at
Fixed at 4 s
Fixed at
Variable
Variable
Variable
Variable
Configurable
Configurable
Configurable
Configurable
Others:
Transmission Delay:
Need Time Delay:
Select/Operate Arm Timeout:
Binary Input change scanning period:
Packed binary change process period:
Analog Input change scanning period:
Unsolicited response notification delay:
Unsolicited response retry delay:
Unsolicited offline interval:
No intentional delay
10 min.
10 s
1 ms
1 s
500 ms
500 ms
Configurable 0 to 60 s
10 min.
Sends/Executes Control Operations:
WRITE Binary Outputs
SELECT/OPERATE
DIRECT OPERATE
DIRECT OPERATE – NO ACK
Never
Never
Never
Never
Always
Always
Always
Always
Sometimes
Sometimes
Sometimes
Sometimes
Configurable
Configurable
Configurable
Configurable
Count > 1
Pulse On
Pulse Off
Latch On
Latch Off
Never
Never
Never
Never
Never
Always
Always
Always
Always
Always
Sometimes
Sometimes
Sometimes
Sometimes
Sometimes
Configurable
Configurable
Configurable
Configurable
Configurable
Queue
Clear Queue
Never
Never
Always
Always
Sometimes
Sometimes
Configurable
Configurable
Содержание Multilin F650
Страница 9: ...8 F650 Digital Bay Controller GEK 106310AB TABLE OF CONTENTS ...
Страница 147: ...4 74 F650 Digital Bay Controller GEK 106310AB 4 3 WEB SERVER 4 HUMAN INTERFACES SETTINGS ACTUAL VALUES 4 ...
Страница 323: ...5 176 F650 Digital Bay Controller GEK 106310AB 5 13 IEC 60870 5 103 PROTOCOL CONFIGURATION 5 SETTINGS 5 ...
Страница 443: ...7 74 F650 Digital Bay Controller GEK 106310AB 7 3 IEC 61850 CONFIGURATOR 7 IEC 61850 PROTOCOL 7 Figure 7 21 ...
Страница 457: ...7 88 F650 Digital Bay Controller GEK 106310AB 7 3 IEC 61850 CONFIGURATOR 7 IEC 61850 PROTOCOL 7 ...
Страница 513: ...10 28 F650 Digital Bay Controller GEK 106310AB 10 18 THERMAL IMAGE ELEMENT 49 10 COMMISSIONING 10 ...
Страница 529: ...12 6 F650 Digital Bay Controller GEK 106310AB 12 4 RELAY CONFIGURATION 12 FREQUENTLY ASKED QUESTIONS 12 ...
Страница 569: ...A 36 F650 Digital Bay Controller GEK 106310AB A 1 LOGIC OPERANDS APPENDIX A A ...
Страница 735: ...C 24 F650 Digital Bay Controller GEK 106310AB C 8 ANALOG INPUTS APPENDIX C C ...
Страница 743: ...D 8 F650 Digital Bay Controller GEK 106310AB D 5 IEC 60870 5 104 POINT LIST APPENDIX D D ...
Страница 755: ...F 10 F650 Digital Bay Controller GEK 106310AB F 1 IEC 60870 5 103 PROTOCOL APPENDIX F F ...
Страница 766: ...GEK 106310AB F650 Digital Bay Controller G 11 APPENDIX G G 1 FACTORY DEFAULT LOGIC G ...
Страница 767: ...G 12 F650 Digital Bay Controller GEK 106310AB G 1 FACTORY DEFAULT LOGIC APPENDIX G G ...
Страница 801: ...I 2 F650 Digital Bay Controller GEK 106310AB I 1 GE MULTILIN WARRANTY APPENDIX I I ...