GE H
EALTHCARE
D
IRECTION
FQ091013, R
EVISION
1
V
IVID
I
N
AND
V
IVID
Q
N S
ERVICE
M
ANUAL
8-140
Section 8-5 - Software Loading
Select one of the following options, as applicable.
E: Save Partition “C\:\” To Image
F: Restore Partition “C\:\” From Image
The following Warning is displayed:
9
To continue, type
Y
.
A message is displayed showing the current system ID.
The CD then begins the software installation process and a progress indicator
is displayed, as shown below:
This stage of the process takes approximately 5 mins.
A message is then displayed on-screen prompting you to press
<CTRL + ALT + DELETE> to reboot the system.
10
Press <Eject> and remove the CD.
Press <CTRL+ALT+DELETE>.
The system re-boots.
11
Proceed to perform the following functionality tests:
•
Software Configuration Checks on page 4 - 37
•
Calibration Tests on page 7 - 25
•
Full System Test on page 7 - 10
Table 8-7
Software Roll-back Procedure(cont’d)
Step
Instruction
Expected Result
Содержание FL000090
Страница 2: ......
Страница 30: ...GE HEALTHCARE DIRECTION FQ091013 REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL xxviii ...
Страница 739: ......