GE H
EALTHCARE
D
IRECTION
FQ091013, R
EVISION
1
V
IVID
I
N
AND
V
IVID
Q
N S
ERVICE
M
ANUAL
Chapter 8 - Replacement Procedures
8-91
8-4-17-4
Probe Shelf Assembly Installation Procedure
1) Position replacement shelf in the required position on the SafeLock Cart.
2)
While supporting the shelf with one hand
, return and fasten the two upper screws previously
removed.
3) Return and fasten the two lower screws (one on either side), making sure that the shelf is firmly
secured in position.
4) Place the required peripheral on the probe shelf assembly.
5) Re-connect all peripherals to the Vivid
i
n/Vivid q N portable ultrasound scanner.
6) Proceed to perform the following functionality tests:
-
SafeLock Cart - Grounding Continuity on page 10 - 23
-
SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
Содержание FL000090
Страница 2: ......
Страница 30: ...GE HEALTHCARE DIRECTION FQ091013 REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL xxviii ...
Страница 739: ......