GE H
EALTHCARE
D
IRECTION
FQ091013, R
EVISION
1
V
IVID
I
N
AND
V
IVID
Q
N S
ERVICE
M
ANUAL
8-88
Section 8-4 - SafeLock Cart Components Replacement
8-4-15-4
Top Shelf Installation Procedure
1) Carefully position the Top Shelf on the upper assembly and replace and fasten the rear and lower
retaining screws.
2) Replace and reconnect the Main Harness, Peripheral power cable as described in
Assembly Installation Procedure on page 8 - 73
and connect the LAN cable.
3) Install the Gas Spring as described in
4) Return the USB Box as described in the
USB Board Installation Procedure on page 8 - 80
.
5) Fasten all cables in position using new cable ties.
6) Return the Lower Cover (Rear) as described in the
Lower Cover (Rear) Installation Procedure on
7) Return the Upper Cover (Rear) as described in the
Upper Cover (Rear) Installation Procedure on
8) Reconnect all required peripherals to the SafeLock Cart.
9) Reconnect the AC adapter and all cables to the Vivid
i
n/Vivid q N portable ultrasound scanner.
10) Proceed to perform the following functionality tests:
-
SafeLock Cart - Grounding Continuity on page 10 - 23
-
SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
Figure 8-101 Top Shelf - Rear Retaining Screws
Top Shelf rear retaining
screws
Содержание FL000090
Страница 2: ......
Страница 30: ...GE HEALTHCARE DIRECTION FQ091013 REVISION 1 VIVID I N AND VIVID Q N SERVICE MANUAL xxviii ...
Страница 739: ......