Section 8-3 - Internal Component Replacement Procedures
7) Re-install the battery as described in the
Battery Installation Procedure on page 8 - 6
8) Return the bearing handle as described in the
Bearing Handle Installation Procedure on page 8 - 4
.
9.) Turn ON the system and boot-up.
10.)Perform the PMC Update procedure, as described in
Installation of PMC Version on page 8 - 135
.
11.)Perform the BIOS Update procedure, as described in
BIOS Firmware Update on page 8 - 118
Note:
If
both
the Back End and the Hard Disk are being replaced simultaneously, continue to the
next step. If only the Back End is being replaced, skip
12) Perform the steps required to burn the LCD type onto the newly-installed Back End, as described
on page 8-56 through
13) Perform a complete functional check of the system, as described in
14.)Proceed to perform the following functionality tests:
-
SafeLock Cart - Grounding Continuity on page 10 - 23
- only if the
Vivid
i
n/ Vivid q N system is currently mounted on the SafeLock cart
-
SafeLock Cart - Chassis Current Leakage Test on page 10 - 25
-
Calibration Tests on page 7 - 25
-