16
Installation and Service Guide: Color Controller E-85A
Installing hardware
•
Is there adequate space for the E-85A near the printer?
Make sure there is enough space at the back and on both sides so that cables do not interfere with use or service of the
printer (for example, clearing a paper jam).
Figure 1:
Space requirements for the E-85A without optional furniture
•
Is a dedicated, grounded electrical outlet for the E-85A available near the printer?
Do not run the E-85A and the printer on the same circuit. If the customer has provided one, use a surge suppressor for
the E-85A.
•
Will the network be available at the time of installation? (See the site administrator.)
Setting customer expectations
When the site is ready, installation of the E-85A takes about 1 hour. Inform the customer of the following:
•
Some nodes on the network may be unavailable during service.
•
The site administrator must be available during the installation for network connectivity.
Equipment downtime and impact on the network can be minimized if the site administrator installs a network connector
for the E-85A and confirms network functionality with the connector in place before the date scheduled for the E-85A
installation.
•
The site administrator must have a networked computer available during the installation. The appropriate software
must be installed in advance. Documentation for the networked computer and the network operating software should be
available.
1
20cm+ (8 in.)
2
E-85A
3
Connector panel
4
Side panel
5
Fiery Quick Touch display panel
6
Front panel
1
3
4
1
2
2
1
3
6
6
5
Top view
Left view