Operating Instructions
Maintenance and Repair
© Copyright by Markem-Imaje CSAT GmbH
ITS6_135_Manual_EN.doc
Subject to Technical Modifications
Page 287 / 370
Maintenance Schedule ITS6
any adhering lint or substrate residue with a brush. Use cloths dampened
in acetone to clean any ink adhering to the metal contacts.
Weekly
Check the clamping function of the cut-and splice device.
Clean the cleaning rollers of the printing substrate cleaning module, see
chap. 10.6.7
“Maintenance of the printing substrate cleaning module”.
Check all guide rollers for freedom of movement and bearing clearance.
Monthly
Check the condensate trap of the compressed air maintenance unit.
Check the separator of the degassing system of the ink management and
drain the condensation as needed, see chap. 10.6.4
parator of the degassing system
Visual check of all screw connections for leaking ink.
Every 3 months
Check connections in compressed air system for leaks.
Clean the cleaning rollers of the printing substrate cleaning module with
the “Roller Doctor System”, see chap. 10.6.7 “Maintenance of the printing
substrate cleaning module
”.
Every 6 months
Check drive belts of the web tension control and the unwinding mandrel of
the unwinding and winding shafts.
On the left front wall, remove the metal cover of the ink management.
Check the intermediate reservoirs for leaking ink.
Once a year
Check all cooling water hoses.
Replace the coolant, provided it circulates in a closed system between the
printer and an external cooling unit.
Replace the non-woven filter of the collection pan.
Replace the non-woven filters of the small collection pans.
Every 2 years
Preventive maintenance by Markem-Imaje CSAT. The measures to be
taken are described in a separate protocol.
Check lighting of camera system.
Every 5 years
Replace all cooling water hoses between the printer and the cooling unit in
question.