SiUS34-801A_b
Test Operation
VRVIII R-410A Heat Pump 60Hz
77
Note:
The air-tightness test and vacuum drying should be done
using the service ports of equalizer pipe, HP/LP gas pipe,
suction gas pipe and liquid pipe shutoff valve.
See the [R-410A] Label attached to the front plate of the
outside unit for details on the location of the service port
(see figure at right)
See
[Shutoff valve operation procedure]
in
10.2.5.1
Before working
for details on handling the shutoff valve.
The refrigerant charge port is connected to unit pipe.
When shipped, the unit contains the refrigerant, so use caution when attaching the charge hose.
<Air tight test>
Pressurize the liquid pipe, suction gas pipe, HP/LP gas pipe and equalizer pipe from the service
ports of each shutoff valve to 478 psi (do not pressurize more than 478 psi). If the pressure does
not drop within 24 hours, the system passes the test.
If there is a pressure drop, check for leaks, make repairs, and perform the airtight test again.
<Vacuum drying>
Evacuate the system from the liquid pipe, suction gas pipe, HP/LP gas pipe and equalizer pipe
shutoff valve service ports by using a vacuum pump for more than 2 hours and bring the system to
–14.6 psi or less. After keeping the system under that condition for more than 1 hour, check if the
vacuum gauge rises or not. If it rises, the system may either contain moisture inside or have leaks.
Note:
If moisture enters the piping, use the following instructions: ( For example, if working in a
rainy season takes long enough that condensation may form on the inside of the pipes,rain
might enter the pipes during work.)
After evacuating the system for 2 hours, pressurize the system to 7.25 psi (vacuum break) with
nitrogen gas and evacuate the system again using the vacuum pump for 1 hour to –14.6 psi or less
(vacuum drying). If the system cannot be evacuated to –14.6 psi within 2 hours, repeat the
operation of vacuum break and vacuum drying.
After leaving the system in vacuum for 1 hour, confirm that the vacuum gauge does not rise.
10.2.4 Pipe Insulation
Insulation of pipes should be done after performing
10.2.3 Air Tight Test and Vacuum Drying
.
Always insulate the liquid piping, the HP/LP gas piping, the gas piping, the equalizer pipe,
(between the outside units for the outdoor multi system) and these pipe connections.
Be sure to insulate the HP/LP gas piping as the suction pipe because the suction gas follows in
the HP/LP gas piping when the system is whole cooling mode.
Be sure to use the insulation that is designed for use with HVAC Systems.
Reinforce the insulation on the refrigerant piping according to the installation environment.
Condensation might form on the surface of the insulation. Refer to the following standards:
Ambient temperature : 86°F, humidity : 75% to 80% RH : min. thickness : 9/16 inches.
If the ambient temperature exceeds 86°F and the humidity 80% RH, then the minimum
thickness is 3/4 inches.
See the Engineering data book for details.
[R-410A] Label
[R-410A] Label
<
RXYQ144PTJU Only
>
Содержание RXYQ96PYDN
Страница 15: ...SiUS34 801A_b xiv...
Страница 23: ...Model Selection SiUS34 801A_b 8 General Information...
Страница 133: ...Field Settings SiUS34 801A_b 118 VRVIII R 410A Heat Pump 60Hz...
Страница 254: ...SiUS34 801A_b Test Operation VRVIII R 410A Heat Recovery 60Hz 239 R 410A Label R 410A Label...
Страница 329: ...Field Setting SiUS34 801A_b 314 Indoor Unit...
Страница 340: ...SiUS34 801A_b Troubleshooting by Remote Controller Troubleshooting 325...
Страница 489: ...Piping Diagrams SiUS34 801A_b 474 Appendix 1 Piping Diagrams 1 1 Outdoor Unit Heat Pump 460V RXYQ72 96 120PYDN 3D058636A...
Страница 490: ...SiUS34 801A_b Piping Diagrams Appendix 475 Heat Pump 230V RXYQ72 96 120PTJU 3D058636A...
Страница 491: ...Piping Diagrams SiUS34 801A_b 476 Appendix Heat Pump 230V RXYQ144PTJU 3D058640...
Страница 492: ...SiUS34 801A_b Piping Diagrams Appendix 477 Heat Recovery 460V REYQ72 96 120PYDN 3D058639A...
Страница 493: ...Piping Diagrams SiUS34 801A_b 478 Appendix Heat Recovery 460V REMQ72PYDN 3D058637A...
Страница 494: ...SiUS34 801A_b Piping Diagrams Appendix 479 Heat Recovery 460V REMQ96 120PYDN 3D058638A...
Страница 495: ...Piping Diagrams SiUS34 801A_b 480 Appendix Heat Recovery 230V REYQ72 96 120PTJU 3D058639A...
Страница 496: ...SiUS34 801A_b Piping Diagrams Appendix 481 Heat Recovery 230V REYQ144PTJU 3D058640...
Страница 497: ...Piping Diagrams SiUS34 801A_b 482 Appendix Heat Recovery 230V REMQ72PTJU 3D058637A...
Страница 498: ...SiUS34 801A_b Piping Diagrams Appendix 483 Heat Recovery 230V REMQ96 120PTJU 3D058638A...
Страница 501: ...Piping Diagrams SiUS34 801A_b 486 Appendix 1 3 BS Unit 4D057985A...
Страница 537: ...Piping Installation Point SiUS34 801A_b 522 Appendix...
Страница 543: ...Pressure Sensor SiUS34 801A_b 528 Appendix...
Страница 559: ...Precautions for New Refrigerant R 410A SiUS34 801A_b 544 Precautions for New Refrigerant R 410A...
Страница 563: ...SiUS34 801A_b iv Index...