SiUS34-801A_b
Test Operation
VRVIII R-410A Heat Pump 60Hz
87
Notes (*1)~(*9)
(*1) Lead the refrigerant charge hose from the pipe intake.
All front panels must be closed at procedure (7).
(*2)
•
If you perform the refrigerant charging operation within a refrigerant system that has the
power off to one or more units, the operation cannot finish properly.
Check the number of outside and indoor units that are powered.
For checking, see [How to check how many units are connected] in chapter 10.2.5.1.
•
To energize the crankcase heater, make sure to turn on for 6 hours before starting operation.
(*3) It takes about 2~10 minutes to achieve refrigerant stability.
If the additional refrigerant is too small an amount and operation is started before achieving
stability, the system cannot precisely judge the charging amount, resulting in overcharging.
(*4) If the TEST button (BS4) is not pushed within 5 minutes, [
P2
] code will be displayed in the
remote controller. In this case, refer to [Remote controller cooling (or heating) mode
malfunction code].
(*5) If the front panel is opened during the operation, the system cannot operate properly.
(*6) If you leave the system without connecting the refrigerant tank or opening valve A for 30
minutes or more, the system stops operation and the [
P2
] code is displayed in the remote
controller. In this case, refer to [Remote controller cooling (or heating) mode malfunction code].
(*7) Depending on the situation of operation such as a small charging amount, the [
PE
] code may
not be displayed and the [
P9
] code may be displayed.
(*8) Always close valve A and take the tank off.
The refrigerant charge port of this unit has an electronic expansion valve and the valve is
closed when charging is finished. However, the valve opens when other operations occur. If
you leave the tank connected, the refrigerant will overcharge.
[Remote controller cooling mode malfunction code]
[Remote controller heating mode malfunction code]
6. After completing the additional refrigerant charging, record the charging amount on the
accessory
[REQUEST FOR THE INDICATON]
label (Installation records) and adhere it to the
back side of the front panel. Also, record the factory charged refrigerant amount, additional
refrigerant amount in the field and total refrigerant amount of the system to
[ADDITIONAL REF.
CHARGE]
label and adhere in the proximity of the refrigerant charge port.
Code
The work contents
PE
Charging is almost finished. Ready to close valve A.
PA
PH
The refrigerant tank is empty. Close valve A and replace empty tank to the new tank. After changing the
tank, open valve A again.
Be cautious of the fan running.
The outside unit does not stop operation.
P8
Close the valve A immediately, and restart the operation from procedure (3).
P2
Operation is interrupted. Close valve A immediately and check
the below items.
• Check if the gas pipe or liquid pipe shutoff valve is opened.
• Check that the refrigerant tank is connected and valve A was
opened.
• Check to ensure that the air inlet and outlet of the indoor unit
are not closed by an obstruction.
After correcting the abnormality,
restart the operation from procedure
(3).
∗
Operation is stopped abnormally. Close valve A immediately. Confirm
the malfunction code and correct the abnormality following the
[Remote controller displays malfunction code] in chapter 10.2.5.4.
P9
Charging is finished. Close valve A and take the refrigerant tank off.
Code
The work contents
P8
Close valve A immediately and push the TEST button (BS4) once. Restart from
Procedure (7)
In case of
heating mode
.
P2
Operation is interrupted. Close valve A immediately and check the below items.
• Check if the gas pipe or liquid pipe shutoff valve is opened.
• Check the refrigerant tank is connected and valve A was opened.
• Check to ensure that the air inlet and outlet of the indoor unit are not closed by an obstruction.
Содержание RXYQ96PYDN
Страница 15: ...SiUS34 801A_b xiv...
Страница 23: ...Model Selection SiUS34 801A_b 8 General Information...
Страница 133: ...Field Settings SiUS34 801A_b 118 VRVIII R 410A Heat Pump 60Hz...
Страница 254: ...SiUS34 801A_b Test Operation VRVIII R 410A Heat Recovery 60Hz 239 R 410A Label R 410A Label...
Страница 329: ...Field Setting SiUS34 801A_b 314 Indoor Unit...
Страница 340: ...SiUS34 801A_b Troubleshooting by Remote Controller Troubleshooting 325...
Страница 489: ...Piping Diagrams SiUS34 801A_b 474 Appendix 1 Piping Diagrams 1 1 Outdoor Unit Heat Pump 460V RXYQ72 96 120PYDN 3D058636A...
Страница 490: ...SiUS34 801A_b Piping Diagrams Appendix 475 Heat Pump 230V RXYQ72 96 120PTJU 3D058636A...
Страница 491: ...Piping Diagrams SiUS34 801A_b 476 Appendix Heat Pump 230V RXYQ144PTJU 3D058640...
Страница 492: ...SiUS34 801A_b Piping Diagrams Appendix 477 Heat Recovery 460V REYQ72 96 120PYDN 3D058639A...
Страница 493: ...Piping Diagrams SiUS34 801A_b 478 Appendix Heat Recovery 460V REMQ72PYDN 3D058637A...
Страница 494: ...SiUS34 801A_b Piping Diagrams Appendix 479 Heat Recovery 460V REMQ96 120PYDN 3D058638A...
Страница 495: ...Piping Diagrams SiUS34 801A_b 480 Appendix Heat Recovery 230V REYQ72 96 120PTJU 3D058639A...
Страница 496: ...SiUS34 801A_b Piping Diagrams Appendix 481 Heat Recovery 230V REYQ144PTJU 3D058640...
Страница 497: ...Piping Diagrams SiUS34 801A_b 482 Appendix Heat Recovery 230V REMQ72PTJU 3D058637A...
Страница 498: ...SiUS34 801A_b Piping Diagrams Appendix 483 Heat Recovery 230V REMQ96 120PTJU 3D058638A...
Страница 501: ...Piping Diagrams SiUS34 801A_b 486 Appendix 1 3 BS Unit 4D057985A...
Страница 537: ...Piping Installation Point SiUS34 801A_b 522 Appendix...
Страница 543: ...Pressure Sensor SiUS34 801A_b 528 Appendix...
Страница 559: ...Precautions for New Refrigerant R 410A SiUS34 801A_b 544 Precautions for New Refrigerant R 410A...
Страница 563: ...SiUS34 801A_b iv Index...