Test Operation
SiUS34-801A_b
76
VRVIII R-410A Heat Pump 60Hz
10.2.3 Air Tight Test and Vacuum Drying
After finishing piping work, carry out airtight test and vacuum drying.
Note:
Always use nitrogen gas for the airtightness test.
Absolutely do not open the shutoff valve until the main power circuit insulation measurement
has been completed. Measuring after the shutoff valve is opened will cause the insulation value
to drop.
<Needed tools>
<The system for air tight test and vacuum drying>
Referring to figure 25, connect a nitrogen tank, refrigerant tank, and a vacuum pump to the
outside unit.
The refrigerant tank and the charge hose connection to refrigerant charge port or valve A in
figure 25 are needed in
10.2.5 Additional Refrigerant Charge and Check Operation
.
Gauge manifold
Charge hose
valve
To prevent entry of any impurities and insure sufficient pressure
resistance, always use the special tools dedicated for R-410A.
Use charge hose that has a pushing stick for connecting to service port of
shutoff valves or refrigerant charge port.
Vacuum pump
The vacuum pump for vacuum drying should be able to lower the pressure
to –14.6 psi.
Take care the pump oil never flows backward into the refrigerant pipe
when the pump stops.
Gauge manifold
Nitrogen
Measuring
device
R-410A tank (with siphon)
Vacuum pump
Charge hose
High side equalizer pipe shutoff valve
Gas pipe shutoff valve
Low side equalizer pipe shutoff valve
Liquid pipe shutoff valve
Valve B
Outside unit Outside unit
Indoor unit
Shutoff valve
Refrigerant charge port
Valve A
: Field piping
: Gas flow
Valve C
( Service port)
Gauge manifold
Nitrogen
Measuring
device
R-410A tank (with siphon)
Vacuum pump
Charge hose
Refrigerant charge port
Gas pipe shutoff valve
Liquid pipe shutoff valve
Outside unit
Indoor unit
Valve A
Valve B
: Field piping
: Gas flow
Valve C
(
)
: Shutoff valve
: Service port
< RXYQ144PTJU Only >
fig. 25
Содержание RXYQ96PYDN
Страница 15: ...SiUS34 801A_b xiv...
Страница 23: ...Model Selection SiUS34 801A_b 8 General Information...
Страница 133: ...Field Settings SiUS34 801A_b 118 VRVIII R 410A Heat Pump 60Hz...
Страница 254: ...SiUS34 801A_b Test Operation VRVIII R 410A Heat Recovery 60Hz 239 R 410A Label R 410A Label...
Страница 329: ...Field Setting SiUS34 801A_b 314 Indoor Unit...
Страница 340: ...SiUS34 801A_b Troubleshooting by Remote Controller Troubleshooting 325...
Страница 489: ...Piping Diagrams SiUS34 801A_b 474 Appendix 1 Piping Diagrams 1 1 Outdoor Unit Heat Pump 460V RXYQ72 96 120PYDN 3D058636A...
Страница 490: ...SiUS34 801A_b Piping Diagrams Appendix 475 Heat Pump 230V RXYQ72 96 120PTJU 3D058636A...
Страница 491: ...Piping Diagrams SiUS34 801A_b 476 Appendix Heat Pump 230V RXYQ144PTJU 3D058640...
Страница 492: ...SiUS34 801A_b Piping Diagrams Appendix 477 Heat Recovery 460V REYQ72 96 120PYDN 3D058639A...
Страница 493: ...Piping Diagrams SiUS34 801A_b 478 Appendix Heat Recovery 460V REMQ72PYDN 3D058637A...
Страница 494: ...SiUS34 801A_b Piping Diagrams Appendix 479 Heat Recovery 460V REMQ96 120PYDN 3D058638A...
Страница 495: ...Piping Diagrams SiUS34 801A_b 480 Appendix Heat Recovery 230V REYQ72 96 120PTJU 3D058639A...
Страница 496: ...SiUS34 801A_b Piping Diagrams Appendix 481 Heat Recovery 230V REYQ144PTJU 3D058640...
Страница 497: ...Piping Diagrams SiUS34 801A_b 482 Appendix Heat Recovery 230V REMQ72PTJU 3D058637A...
Страница 498: ...SiUS34 801A_b Piping Diagrams Appendix 483 Heat Recovery 230V REMQ96 120PTJU 3D058638A...
Страница 501: ...Piping Diagrams SiUS34 801A_b 486 Appendix 1 3 BS Unit 4D057985A...
Страница 537: ...Piping Installation Point SiUS34 801A_b 522 Appendix...
Страница 543: ...Pressure Sensor SiUS34 801A_b 528 Appendix...
Страница 559: ...Precautions for New Refrigerant R 410A SiUS34 801A_b 544 Precautions for New Refrigerant R 410A...
Страница 563: ...SiUS34 801A_b iv Index...