
4
|
Components
Service manual
206
EBLA04~08E + EDLA04~08E
Daikin Altherma 3 M
ESIE22-09 – 2022.05
a
a
Drip proof cover
4.16.8 To remove the switch box
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
202].
1
Loosen and remove the 3 screws that fix the switch box to the unit.
INFORMATION
The 2 screws at the hydro box side are reachable using a small ratchet ¼ inch and
socket nr. 8 or wrench ¼ inch with a cardan joint.
a
a
a
b
a
Screw
b
Switch box
2
Tilt the switch box until the wiring connection on the power supply terminal is
accessible.
3
Disconnect the wiring from the switch box.
draft – 31/05/2022 15:53
Содержание EBLA04E V Series
Страница 322: ...14 14...
Страница 323: ......
Страница 324: ...draft 31 05 2022 15 53 ESIE22 09 2022 05 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...