172
1.1 Features
intelligent Manager
1.1.4 Automated Operation Management
Before start
Air conditioning
ON
Comfortable
indoor temperature
Start of the day
Outdoor air supply saves energy.
Indoor temperature: 26
Indoor unit OFF
Ventilation fan on
(e.g.)Pre-cooling and pre-heating control realises
comfortable temperature at the start of the day.
Based on a predetermined schedule, the
Manager
executes capacity control and intermittent operation of A/Cs so as
not to increase the discomfort index.
Reduces power consumption by 10 to 40%,
while maintaining room comfort.
Power limit control
This function switches the air conditioning system on before-
hand so that the temperature is just right when users arrive.
This function estimates the power consumption and oper-
ates at the maximum level within a limited range if the set
point is likely to be exceeded. This reduces power consump-
tion while maintaining comfort as far as possible.
· Alternative stop control of
indoor A/C units
· Outdoor unit capacity control
(only for VRV)
During cooling operation, this function shuts down the
air conditioning equipment and brings in cool air from
outside when the system determines that the outdoor
temperature is lower than the temperature setting. Us-
ing outside air for cooling reduces energy consumption.
Power consumption prediction based control.
Provide more comfortable environment
· Flexible group configuration
· Set Point
· Real time control
· 30 minutes prediction time
OFF
100%
70%
40%
Automated control functions free the operator from the details of
daily operation management.
· Daily operation start/stop time settings
· Holiday settings
· Automatic switching to heating (fan) mode
· Automatic switching of temperature settings
Schedule
Analogue interlock
Econo mode (option)
outdoor temp : 30
outdoor temp : 24
*
Please consult a sales representative on project basis.
*
Please consult a sales representative on project basis.
Содержание D-BACS
Страница 1: ...ED 72 721 Preliminary Daikin Buildings Air conditioning Control System D BACS DESIGN GUIDE ...
Страница 17: ...xvi 1 5 Open Network Glossary Introduction ...
Страница 41: ...24 Outline of D BACS System ...
Страница 74: ...57 Remote Controllers HRV Wired remote controller BRC301B61 VAM ...
Страница 88: ...3 6 Wired Remote Controller with Weekly Schedule Timer BRC1D61 71 Remote Controllers 3P107422 3D ...
Страница 102: ...5 2 Wireless Remote Controller BRC4C 7C 7E 85 Remote Controllers 5 2 Wireless Remote Controller BRC4C 7C 7E ...
Страница 103: ...86 5 3 Simplified Remote Controller BRC2C51 BRC2A51 Remote Controllers 5 3 Simplified Remote Controller BRC2C51 BRC2A51 ...
Страница 107: ...90 5 4 HRV BRC301B61 Remote Controllers ...
Страница 142: ...1 2 System Configuration 125 Control Devices 1 2 System Configuration System Outline ...
Страница 181: ...164 3 8 Error Diagnosing Function Control Devices ...
Страница 215: ...198 3 8 Wiring Example intelligent Manager ...
Страница 235: ...218 Interface for Use in BACnet ...
Страница 249: ...232 7 1 Node Objects Interface for use in LONWORKS 7 Object Details 7 1 Node Objects 7 2 DIII NET Common Objects ...
Страница 253: ...236 Interface for use in LONWORKS 10 Reference Materials Error Code Conversion Table ...
Страница 268: ...251 Interface for use in LONWORKS 13 Workflow ...
Страница 285: ...268 1 6 Notes Power Proportional Distribution P P D ...
Страница 319: ...302 1 5 Dio Unit DEC102A51 Adaptor 1 5 2 Part Names and Functions 1 Appearance Dio Unit DEC102A51 ...
Страница 329: ...312 1 6 Di Unit DEC101A51 Adaptor 1 6 2 Part Names and Functions 1 Appearance Di Unit DEC101A51 ...